MSB was commissioned by Neath Port Talbot Hospital, situated in the heart of Port Talbot, South Wales, to deliver a temporary boiler solution whilst the Trust evaluated long-term upgrade pathways for its ageing primary plant.
Our engineers developed a fully coordinated mechanical, electrical, and controls design to support the deployment of 4 × 280 kW Ideal IMAX commercial boilers, ensuring full interoperability with the hospital’s existing Building Management System (BMS) and primary heating circuit. This included integration of duty/assist/standby sequencing, hydraulic interface detail, electrical distribution, and networked control architecture to maintain resilience and operational visibility for estates teams.