MSB Group were entrusted with delivering a critical boiler replacement project at Bexleyheath Academy, ensuring the school’s heating system was upgraded to a modern, efficient, and future-proof solution. With the plantroom located on the first floor and only a narrow window available during the school holidays, the project demanded meticulous planning and execution to avoid any disruption to the academy’s operations.
Drawing on our in-house design and engineering expertise, we developed a tailored heating solution that not only addressed the immediate needs of the academy but also provided long-term reliability and efficiency. Thanks to close collaboration between our project managers, engineers, and installation team, the works were delivered ahead of schedule and fully commissioned in time for the new term.
Project highlights included:
-
Installation of 4 x 280kW Ideal IMax2 boilers
-
Integration of a 1200kW plate heat exchanger
-
Installation of new flues and a gas safety system
-
Seamless reconnection to the existing BMS system
-
Full system flush, testing, and commissioning
The successful completion of this project demonstrates MSB Group’s ability to deliver technically complex building services solutions under tight timeframes, without compromising on quality or safety. The academy now benefits from a dependable, energy-efficient heating system designed to serve its staff and students for many years to come.